{
  "meta": {
    "generatedAt": "2026-07-15T20:24:10.391Z",
    "method": "Header-/Label-Scan (Zeilen 1-80, Spalten 1-40 je Blatt) via ExcelJS auf Sample. Keine Zellwerte/Preise erfasst -- nur erkannte Feld-Label-Texte (Header) als Nachweis.",
    "corpusTotal": 374,
    "sampleTotal": 80,
    "sampleOkCount": 78,
    "sampleFailedFiles": [
      {
        "file": "QAF_FBK_G20-G22 20P_Quote 3_20131002.xls",
        "error": "Can't find end of central directory : is this a zip file ? If it is, see https://stuk.github.io/jszip/documentation/howto/read_zip.html"
      },
      {
        "file": "QAF_FBK_G20-G22 40P LH_Quote 3_20131002.xls",
        "error": "Can't find end of central directory : is this a zip file ? If it is, see https://stuk.github.io/jszip/documentation/howto/read_zip.html"
      }
    ],
    "familyPopulation": {
      "QAF_LEGACY_DE_SUMMARY": 267,
      "QAF_V9_SUMMARY": 79,
      "UNMATCHED_STANDARD": 12,
      "MULTI_qaf_8_1_custom_multi": 7,
      "G60_DETAIL": 2,
      "AMBIGUOUS_unknown_multi_qaf": 2,
      "MULTI_m_qaf_1_0": 2,
      "LEGACY_XLS_UNSUPPORTED": 2,
      "MULTI_m_qaf_2_0": 1
    },
    "fieldGroupDefinitions": {
      "A_process_params": "Zykluszeit, Teile/Zyklus, Mitarbeiter(MA), Maschinenstundensatz(MSS), Ineffizienz",
      "B_master_rates": "Lohnsatz, SG&A %, Gewinn %, Scrap %",
      "C_material": "Einzelkosten, Materialliste/Positionen, Waehrung",
      "D_manufacturing_rows": "Prozessschritt-Namen, Fertigungskosten je Schritt, MSS/MA/Zyklus-Spalten",
      "E_totals": "Materialkosten gesamt, Fertigungskosten gesamt, SG&A, Gewinn, Stueckpreis",
      "F_meta": "Sachnummer, Lieferant, Datum, Waehrung, Volumen/Jahresstueckzahl"
    }
  },
  "capabilityMatrix": {
    "G60_DETAIL": {
      "sampleN": 2,
      "okN": 2,
      "groups": {
        "A_process_params": {
          "vorhanden": 0,
          "teilweise": 1,
          "fehlt": 1,
          "pctVorhanden": 0,
          "pctAny": 50,
          "topSheets": [
            [
              "2026",
              1
            ]
          ]
        },
        "B_master_rates": {
          "vorhanden": 1,
          "teilweise": 1,
          "fehlt": 0,
          "pctVorhanden": 50,
          "pctAny": 100,
          "topSheets": [
            [
              "INPUT",
              2
            ]
          ]
        },
        "C_material": {
          "vorhanden": 0,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "TOOL-Device",
              2
            ]
          ]
        },
        "D_manufacturing_rows": {
          "vorhanden": 0,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "01",
              2
            ]
          ]
        },
        "E_totals": {
          "vorhanden": 0,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "INPUT",
              2
            ]
          ]
        },
        "F_meta": {
          "vorhanden": 2,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "TOOL-Device",
              2
            ]
          ]
        }
      }
    },
    "MULTI_qaf_8_1_custom_multi": {
      "sampleN": 7,
      "okN": 7,
      "groups": {
        "A_process_params": {
          "vorhanden": 7,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              3
            ],
            [
              "LV Detail EU",
              2
            ],
            [
              "Substantial Process Cost",
              1
            ]
          ]
        },
        "B_master_rates": {
          "vorhanden": 1,
          "teilweise": 6,
          "fehlt": 0,
          "pctVorhanden": 14,
          "pctAny": 100,
          "topSheets": [
            [
              "Dokumentenlenkung",
              3
            ],
            [
              "Zusammenfassung",
              2
            ],
            [
              "Summary",
              2
            ]
          ]
        },
        "C_material": {
          "vorhanden": 5,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 71,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              3
            ],
            [
              "Zusammenfassung",
              2
            ],
            [
              "Legend",
              1
            ]
          ]
        },
        "D_manufacturing_rows": {
          "vorhanden": 7,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              3
            ],
            [
              "LV Detail EU",
              2
            ],
            [
              "Legend",
              1
            ]
          ]
        },
        "E_totals": {
          "vorhanden": 1,
          "teilweise": 6,
          "fehlt": 0,
          "pctVorhanden": 14,
          "pctAny": 100,
          "topSheets": [
            [
              "Dokumentenlenkung",
              3
            ],
            [
              "Zusammenfassung",
              2
            ],
            [
              "Summary",
              2
            ]
          ]
        },
        "F_meta": {
          "vorhanden": 7,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              5
            ],
            [
              "Summary",
              2
            ]
          ]
        }
      }
    },
    "MULTI_m_qaf_2_0": {
      "sampleN": 1,
      "okN": 1,
      "groups": {
        "A_process_params": {
          "vorhanden": 1,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              1
            ]
          ]
        },
        "B_master_rates": {
          "vorhanden": 0,
          "teilweise": 1,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              1
            ]
          ]
        },
        "C_material": {
          "vorhanden": 0,
          "teilweise": 1,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              1
            ]
          ]
        },
        "D_manufacturing_rows": {
          "vorhanden": 1,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              1
            ]
          ]
        },
        "E_totals": {
          "vorhanden": 0,
          "teilweise": 1,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              1
            ]
          ]
        },
        "F_meta": {
          "vorhanden": 1,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              1
            ]
          ]
        }
      }
    },
    "AMBIGUOUS_unknown_multi_qaf": {
      "sampleN": 2,
      "okN": 2,
      "groups": {
        "A_process_params": {
          "vorhanden": 2,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "help",
              2
            ]
          ]
        },
        "B_master_rates": {
          "vorhanden": 2,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "help",
              2
            ]
          ]
        },
        "C_material": {
          "vorhanden": 0,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "Lenkungsinfo",
              2
            ]
          ]
        },
        "D_manufacturing_rows": {
          "vorhanden": 0,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "gAMS_####",
              2
            ]
          ]
        },
        "E_totals": {
          "vorhanden": 0,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "help",
              2
            ]
          ]
        },
        "F_meta": {
          "vorhanden": 2,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Lenkungsinfo",
              2
            ]
          ]
        }
      }
    },
    "MULTI_m_qaf_1_0": {
      "sampleN": 2,
      "okN": 2,
      "groups": {
        "A_process_params": {
          "vorhanden": 2,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              2
            ]
          ]
        },
        "B_master_rates": {
          "vorhanden": 0,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              2
            ]
          ]
        },
        "C_material": {
          "vorhanden": 1,
          "teilweise": 1,
          "fehlt": 0,
          "pctVorhanden": 50,
          "pctAny": 100,
          "topSheets": [
            [
              "Material",
              1
            ],
            [
              "Zusammenfassung",
              1
            ]
          ]
        },
        "D_manufacturing_rows": {
          "vorhanden": 2,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              2
            ]
          ]
        },
        "E_totals": {
          "vorhanden": 0,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              2
            ]
          ]
        },
        "F_meta": {
          "vorhanden": 2,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              2
            ]
          ]
        }
      }
    },
    "LEGACY_XLS_UNSUPPORTED": {
      "sampleN": 2,
      "okN": 0,
      "groups": {
        "A_process_params": {
          "vorhanden": 0,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 0,
          "topSheets": []
        },
        "B_master_rates": {
          "vorhanden": 0,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 0,
          "topSheets": []
        },
        "C_material": {
          "vorhanden": 0,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 0,
          "topSheets": []
        },
        "D_manufacturing_rows": {
          "vorhanden": 0,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 0,
          "topSheets": []
        },
        "E_totals": {
          "vorhanden": 0,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 0,
          "topSheets": []
        },
        "F_meta": {
          "vorhanden": 0,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 0,
          "pctAny": 0,
          "topSheets": []
        }
      }
    },
    "QAF_LEGACY_DE_SUMMARY": {
      "sampleN": 41,
      "okN": 41,
      "groups": {
        "A_process_params": {
          "vorhanden": 39,
          "teilweise": 0,
          "fehlt": 2,
          "pctVorhanden": 95,
          "pctAny": 95,
          "topSheets": [
            [
              "Fertigungskosten",
              32
            ],
            [
              "Fertigungskosten_CP44",
              2
            ],
            [
              "Fertigungskosten_18",
              2
            ]
          ]
        },
        "B_master_rates": {
          "vorhanden": 9,
          "teilweise": 32,
          "fehlt": 0,
          "pctVorhanden": 22,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              37
            ],
            [
              "Dokumentenlenkung",
              3
            ],
            [
              "Fertigungskosten",
              1
            ]
          ]
        },
        "C_material": {
          "vorhanden": 39,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 95,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              33
            ],
            [
              "Fertigungskosten_CP44",
              2
            ],
            [
              "Zusammenfassung",
              2
            ]
          ]
        },
        "D_manufacturing_rows": {
          "vorhanden": 39,
          "teilweise": 2,
          "fehlt": 0,
          "pctVorhanden": 95,
          "pctAny": 100,
          "topSheets": [
            [
              "Fertigungskosten",
              32
            ],
            [
              "Machine hourly rate",
              3
            ],
            [
              "Zusammenfassung",
              2
            ]
          ]
        },
        "E_totals": {
          "vorhanden": 0,
          "teilweise": 32,
          "fehlt": 9,
          "pctVorhanden": 0,
          "pctAny": 78,
          "topSheets": [
            [
              "Zusammenfassung",
              28
            ],
            [
              "Dokumentenlenkung",
              3
            ],
            [
              "Fertigungskosten",
              1
            ]
          ]
        },
        "F_meta": {
          "vorhanden": 41,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Zusammenfassung",
              41
            ]
          ]
        }
      }
    },
    "QAF_V9_SUMMARY": {
      "sampleN": 12,
      "okN": 12,
      "groups": {
        "A_process_params": {
          "vorhanden": 12,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Manufactering costs",
              4
            ],
            [
              "MANUFACTURING COSTS",
              3
            ],
            [
              "Substantial Manufacturing",
              3
            ]
          ]
        },
        "B_master_rates": {
          "vorhanden": 2,
          "teilweise": 10,
          "fehlt": 0,
          "pctVorhanden": 17,
          "pctAny": 100,
          "topSheets": [
            [
              "Summary",
              6
            ],
            [
              "Assumptions sheet SBM",
              3
            ],
            [
              "Auswahlfeld",
              2
            ]
          ]
        },
        "C_material": {
          "vorhanden": 3,
          "teilweise": 9,
          "fehlt": 0,
          "pctVorhanden": 25,
          "pctAny": 100,
          "topSheets": [
            [
              "Summary",
              6
            ],
            [
              "MANUFACTURING COSTS",
              3
            ],
            [
              "Legend",
              3
            ]
          ]
        },
        "D_manufacturing_rows": {
          "vorhanden": 12,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Manufactering costs",
              4
            ],
            [
              "MANUFACTURING COSTS",
              3
            ],
            [
              "Legend",
              3
            ]
          ]
        },
        "E_totals": {
          "vorhanden": 0,
          "teilweise": 7,
          "fehlt": 5,
          "pctVorhanden": 0,
          "pctAny": 58,
          "topSheets": [
            [
              "Assumptions sheet SBM",
              4
            ],
            [
              "Auswahlfeld",
              2
            ],
            [
              "CO2e POTENTIAL _",
              1
            ]
          ]
        },
        "F_meta": {
          "vorhanden": 12,
          "teilweise": 0,
          "fehlt": 0,
          "pctVorhanden": 100,
          "pctAny": 100,
          "topSheets": [
            [
              "Summary",
              9
            ],
            [
              "SUMMARY",
              3
            ]
          ]
        }
      }
    },
    "UNMATCHED_STANDARD": {
      "sampleN": 11,
      "okN": 11,
      "groups": {
        "A_process_params": {
          "vorhanden": 0,
          "teilweise": 6,
          "fehlt": 5,
          "pctVorhanden": 0,
          "pctAny": 55,
          "topSheets": [
            [
              "Kalkulation",
              4
            ],
            [
              "Checkliste Vorklärung",
              1
            ],
            [
              "OEE - Scrap - HK-Plus",
              1
            ]
          ]
        },
        "B_master_rates": {
          "vorhanden": 0,
          "teilweise": 6,
          "fehlt": 5,
          "pctVorhanden": 0,
          "pctAny": 55,
          "topSheets": [
            [
              "Lohnsatz",
              2
            ],
            [
              "Kalkulation",
              2
            ],
            [
              "Tabelle1",
              1
            ]
          ]
        },
        "C_material": {
          "vorhanden": 1,
          "teilweise": 6,
          "fehlt": 4,
          "pctVorhanden": 9,
          "pctAny": 64,
          "topSheets": [
            [
              "Prämissenblatt",
              4
            ],
            [
              "Tabelle1",
              1
            ],
            [
              "00_Kernbefund",
              1
            ]
          ]
        },
        "D_manufacturing_rows": {
          "vorhanden": 0,
          "teilweise": 5,
          "fehlt": 6,
          "pctVorhanden": 0,
          "pctAny": 45,
          "topSheets": [
            [
              "Prämissenblatt",
              4
            ],
            [
              "Tabelle1",
              1
            ]
          ]
        },
        "E_totals": {
          "vorhanden": 0,
          "teilweise": 1,
          "fehlt": 10,
          "pctVorhanden": 0,
          "pctAny": 9,
          "topSheets": [
            [
              "Tabelle1",
              1
            ]
          ]
        },
        "F_meta": {
          "vorhanden": 6,
          "teilweise": 4,
          "fehlt": 1,
          "pctVorhanden": 55,
          "pctAny": 91,
          "topSheets": [
            [
              "Übersicht",
              2
            ],
            [
              "Übersicht Angebot Runde 9",
              2
            ],
            [
              "Tabelle1",
              1
            ]
          ]
        }
      }
    }
  },
  "perFile": [
    {
      "file": "100 - G60_DP_QAF_Basis_24_10_BMW.xlsm",
      "family": "G60_DETAIL",
      "ok": true,
      "error": null,
      "sheetNames": [
        "TOOL-Device",
        "Stückzahlen",
        "Setzteilpreise",
        "Oberflächen",
        "Kaufteile CN",
        "CNY",
        "INPUT",
        "PM",
        "Serie 02",
        "Preise 02",
        "Übersicht Angebot_G60G61",
        "01",
        "01_2",
        "02",
        "02_2",
        "03",
        "03_2",
        "04",
        "04_2",
        "05",
        "05_2",
        "05 (2)",
        "05_2 (2)",
        "06",
        "06_2",
        "06 (2)",
        "06_2 (2)",
        "07",
        "07_2",
        "08",
        "08_2",
        "8 (2)",
        "8_2 (2)",
        "10",
        "10_2",
        "12",
        "12_2",
        "13",
        "13_2",
        "14",
        "14_2",
        "16",
        "16_2",
        "17",
        "17_2",
        "18",
        "18_2",
        "19",
        "19_2",
        "20",
        "20_2",
        "21",
        "21_2",
        "22",
        "22_2",
        "23",
        "23_2",
        "24",
        "24_2",
        "25",
        "25_2",
        "26",
        "26_2",
        "27",
        "27_2",
        "28",
        "28_2",
        "29",
        "29_2",
        "30",
        "30_2",
        "32",
        "32_2",
        "33",
        "33_2",
        "34",
        "34_2",
        "35",
        "35_2",
        "38",
        "38_2",
        "39",
        "39_2",
        "40",
        "40_2",
        "41",
        "41_2",
        "42",
        "42_2",
        "43",
        "43_2",
        "43 (2)",
        "43_2 (2)",
        "44",
        "44_2",
        "44 (2)",
        "44_2 (2)",
        "45",
        "45_2",
        "45 (2)",
        "45_2 (2)",
        "45 (3)",
        "45_2 (3)",
        "45 (4)",
        "45_2 (4)",
        "46",
        "46_2",
        "47",
        "47_2",
        "47 (2)",
        "47_2 (2)",
        "48",
        "48_2",
        "49",
        "49_2",
        "49a",
        "49_2a",
        "49b",
        "49_2b",
        "49c",
        "49_2c",
        "50",
        "50_2",
        "50a",
        "50_2a",
        "50b",
        "50_2b",
        "50c",
        "50_2c",
        "51",
        "51_2",
        "52",
        "52_2",
        "53",
        "53_2",
        "54",
        "54_2",
        "54 (2)",
        "54_2 (2)",
        "54 (3)",
        "54_2 (3)",
        "54 (4)",
        "54_2 (4)",
        "55",
        "55_2",
        ">>>>>>",
        "57",
        "57_2",
        "58",
        "58_2",
        "59",
        "59_2",
        "60",
        "60_2",
        "60 (2)",
        "60_2 (2)",
        "61",
        "61_2",
        "61 (2)",
        "61_2 (2)",
        "62",
        "62_2",
        "63",
        "63_2",
        "66",
        "66_2",
        "68",
        "68_2",
        "69",
        "69_2",
        "70",
        "70_2",
        "72",
        "72_2",
        "73",
        "73_2",
        "74",
        "74_2",
        "75",
        "75_2",
        "75_a",
        "75_2_a",
        "76",
        "76_2",
        "77",
        "77_2",
        "79",
        "79_2",
        "79a",
        "79_2a",
        "80",
        "80_2",
        "80a",
        "80_2a",
        "81",
        "81_2",
        "82",
        "82_2",
        "83",
        "83_2",
        "83a",
        "83_2a",
        "83b",
        "83_2b",
        "84",
        "84_2",
        "85",
        "85_2",
        "87",
        "87_2",
        "88",
        "88_2",
        "89",
        "89_2",
        "90",
        "90_2",
        "91",
        "91_2",
        "92",
        "92_2",
        "92 (2)",
        "92_2 (2)",
        "92 (3)",
        "92_2 (3)",
        "93",
        "93_2",
        "94",
        "94_2",
        "95",
        "95_2",
        "95a",
        "95_2a",
        "96",
        "96_2",
        "96a",
        "96_2a",
        "Document Control",
        "Prämissenblatt",
        "SBM_Matrix",
        "SBM_Dropdown"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": []
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "INPUT",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "INPUT",
              "row": 2,
              "col": 11,
              "label": "SG&A"
            },
            {
              "subfield": "profit_pct",
              "sheet": "INPUT",
              "row": 2,
              "col": 12,
              "label": "Profit"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "INPUT",
              "row": 2,
              "col": 10,
              "label": "Scrap"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "TOOL-Device",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "TOOL-Device",
              "row": 2,
              "col": 36,
              "label": "Statement in procurement currency"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "01",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "01",
              "row": 12,
              "col": 7,
              "label": "Manufacturing cost"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "INPUT",
          "foundSubfields": [
            "sga_total",
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "INPUT",
              "row": 2,
              "col": 11,
              "label": "SG&A"
            },
            {
              "subfield": "profit_total",
              "sheet": "INPUT",
              "row": 2,
              "col": 12,
              "label": "Profit"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "TOOL-Device",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "TOOL-Device",
              "row": 3,
              "col": 7,
              "label": "BMW Part number"
            },
            {
              "subfield": "supplier",
              "sheet": "Oberflächen",
              "row": 18,
              "col": 1,
              "label": "Stanzkosten, Stanzmesser, Ausbringung sind durch die Komponenten Lieferanten zu ermitteln und anzubieten."
            },
            {
              "subfield": "date",
              "sheet": "INPUT",
              "row": 5,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "TOOL-Device",
              "row": 2,
              "col": 36,
              "label": "Statement in procurement currency"
            },
            {
              "subfield": "volume",
              "sheet": "Stückzahlen",
              "row": 1,
              "col": 1,
              "label": "Stückzahlen TVKL G60 G61 G90"
            }
          ]
        }
      }
    },
    {
      "file": "171103_Multi-QAF_CLARWE_EU_sz2_SZ_ABD_.xlsx",
      "family": "MULTI_qaf_8_1_custom_multi",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "LV Detail EU",
        "Rüstkosten EU",
        "SBM-SEKOF-FWZ",
        "BOM Detail EU"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "LV Detail EU",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 31,
              "col": 7,
              "label": "Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 27,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "unit_cost",
            "material_list",
            "currency"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "material_list",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 12,
              "label": "siehe Reiter BOM Detail"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "LV Detail EU",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 15,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 31,
              "col": 7,
              "label": "Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "BOM Detail EU",
              "row": 11,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 16,
              "label": "Stückzahlen (lifetime)"
            }
          ]
        }
      }
    },
    {
      "file": "171103_Multi-QAF_CLARWE_EU_sz2_SZ_ABD__NEU.xlsx",
      "family": "MULTI_qaf_8_1_custom_multi",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "LV Detail EU",
        "Rüstkosten EU",
        "SBM-SEKOF-FWZ",
        "BOM Detail EU"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "LV Detail EU",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 31,
              "col": 7,
              "label": "Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 27,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "unit_cost",
            "material_list",
            "currency"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "material_list",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 12,
              "label": "siehe Reiter BOM Detail"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "LV Detail EU",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "LV Detail EU",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 15,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 31,
              "col": 7,
              "label": "Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "BOM Detail EU",
              "row": 11,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 16,
              "label": "Stückzahlen (lifetime)"
            }
          ]
        }
      }
    },
    {
      "file": "184 - [QAF] - 11.1_QAF_EU_Final_V06_180906.xlsx",
      "family": "MULTI_qaf_8_1_custom_multi",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 9,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 11,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 14,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Dokumentenlenkung",
              "row": 11,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 25,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 16,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 17,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 23,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 19,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Dokumentenlenkung",
              "row": 11,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Dokumentenlenkung",
              "row": 9,
              "col": 3,
              "label": "Ersteller\nKurzzeichen\nDatum"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 17,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 21,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "185 - [QAF] - 11.2_QAF_EU_Final_V06_180905_EUR.xlsx",
      "family": "MULTI_qaf_8_1_custom_multi",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 9,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 11,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 14,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Dokumentenlenkung",
              "row": 11,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 25,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 16,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 17,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 23,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 19,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Dokumentenlenkung",
              "row": 11,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Dokumentenlenkung",
              "row": 9,
              "col": 3,
              "label": "Ersteller\nKurzzeichen\nDatum"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 17,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 21,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "186 - [QAF] - 11.3_QAF_EU_Final_V05_180904_CZK.xlsx",
      "family": "MULTI_qaf_8_1_custom_multi",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 9,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 11,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 14,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Dokumentenlenkung",
              "row": 11,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 25,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 16,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 17,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 15,
              "col": 23,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 19,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Dokumentenlenkung",
              "row": 11,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Dokumentenlenkung",
              "row": 9,
              "col": 3,
              "label": "Ersteller\nKurzzeichen\nDatum"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 17,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 21,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "20260508_BMW QAF_G60_DP_RePricing_HO.xlsm",
      "family": "G60_DETAIL",
      "ok": true,
      "error": null,
      "sheetNames": [
        "TOOL-Device",
        "Stückzahlen",
        "2027",
        "2026",
        "Setzteilpreise",
        "Oberflächen",
        "Kaufteile CN",
        "INPUT",
        "PM",
        "Serie 02",
        "Preise 02",
        "Übersicht Angebot_G60G61",
        "01",
        "01_2",
        "02",
        "02_2",
        "03",
        "03_2",
        "04",
        "04_2",
        "05",
        "05_2",
        "05 (2)",
        "05_2 (2)",
        "06",
        "06_2",
        "06 (2)",
        "06_2 (2)",
        "07",
        "07_2",
        "08",
        "08_2",
        "8 (2)",
        "8_2 (2)",
        "10",
        "10_2",
        "12",
        "12_2",
        "13",
        "13_2",
        "14",
        "14_2",
        "16",
        "16_2",
        "17",
        "17_2",
        "18",
        "18_2",
        "19",
        "19_2",
        "20",
        "20_2",
        "21",
        "21_2",
        "22",
        "22_2",
        "23",
        "23_2",
        "24",
        "24_2",
        "25",
        "25_2",
        "26",
        "26_2",
        "27",
        "27_2",
        "28",
        "28_2",
        "29",
        "29_2",
        "30",
        "30_2",
        "32",
        "32_2",
        "33",
        "33_2",
        "34",
        "34_2",
        "35",
        "35_2",
        "38",
        "38_2",
        "39",
        "39_2",
        "40",
        "40_2",
        "41",
        "41_2",
        "42",
        "42_2",
        "43",
        "43_2",
        "43 (2)",
        "43_2 (2)",
        "44",
        "44_2",
        "44 (2)",
        "44_2 (2)",
        "45",
        "45_2",
        "45 (2)",
        "45_2 (2)",
        "45 (3)",
        "45_2 (3)",
        "45 (4)",
        "45_2 (4)",
        "46",
        "46_2",
        "47",
        "47_2",
        "47 (2)",
        "47_2 (2)",
        "48",
        "48_2",
        "49",
        "49_2",
        "49a",
        "49_2a",
        "49b",
        "49_2b",
        "49c",
        "49_2c",
        "50",
        "50_2",
        "50a",
        "50_2a",
        "50b",
        "50_2b",
        "50c",
        "50_2c",
        "51",
        "51_2",
        "52",
        "52_2",
        "53",
        "53_2",
        "54",
        "54_2",
        "54 (2)",
        "54_2 (2)",
        "54 (3)",
        "54_2 (3)",
        "54 (4)",
        "54_2 (4)",
        "55",
        "55_2",
        ">>>>>>",
        "57",
        "57_2",
        "58",
        "58_2",
        "59",
        "59_2",
        "60",
        "60_2",
        "60 (2)",
        "60_2 (2)",
        "61",
        "61_2",
        "61 (2)",
        "61_2 (2)",
        "62",
        "62_2",
        "63",
        "63_2",
        "66",
        "66_2",
        "68",
        "68_2",
        "69",
        "69_2",
        "70",
        "70_2",
        "72",
        "72_2",
        "73",
        "73_2",
        "74",
        "74_2",
        "75",
        "75_2",
        "75_a",
        "75_2a",
        "76",
        "76_2",
        "77",
        "77_2",
        "79",
        "79_2",
        "79a",
        "79_2a",
        "80",
        "80_2",
        "80a",
        "80_2a",
        "81",
        "81_2",
        "82",
        "82_2",
        "83",
        "83_2",
        "83a",
        "83_2a",
        "83b",
        "83_2b",
        "84",
        "84_2",
        "85",
        "85_2",
        "87",
        "87_2",
        "88",
        "88_2",
        "89",
        "89_2",
        "90",
        "90_2",
        "91",
        "91_2",
        "92",
        "92_2",
        "92 (2)",
        "92_2 (2)",
        "92 (3)",
        "92_2 (3)",
        "93",
        "93_2",
        "94",
        "94_2",
        "95",
        "95_2",
        "95a",
        "95_2a",
        "96",
        "96_2",
        "96a",
        "96_2a",
        "Document Control",
        "Prämissenblatt",
        "SBM_Matrix",
        "SBM_Dropdown"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "2026",
          "foundSubfields": [
            "inefficiency"
          ],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "evidence": [
            {
              "subfield": "inefficiency",
              "sheet": "2026",
              "row": 28,
              "col": 1,
              "label": "Ineffizienz"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "INPUT",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "INPUT",
              "row": 24,
              "col": 2,
              "label": "Profit FK"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "INPUT",
              "row": 31,
              "col": 2,
              "label": "Scrap Durchschnitt"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "TOOL-Device",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "TOOL-Device",
              "row": 2,
              "col": 36,
              "label": "Statement in procurement currency"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "01",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "01",
              "row": 12,
              "col": 7,
              "label": "Manufacturing cost"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "INPUT",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "INPUT",
              "row": 24,
              "col": 2,
              "label": "Profit FK"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "TOOL-Device",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "TOOL-Device",
              "row": 3,
              "col": 7,
              "label": "BMW Part number"
            },
            {
              "subfield": "supplier",
              "sheet": "Oberflächen",
              "row": 18,
              "col": 1,
              "label": "Stanzkosten, Stanzmesser, Ausbringung sind durch die Komponenten Lieferanten zu ermitteln und anzubieten."
            },
            {
              "subfield": "date",
              "sheet": "INPUT",
              "row": 5,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "TOOL-Device",
              "row": 2,
              "col": 36,
              "label": "Statement in procurement currency"
            },
            {
              "subfield": "volume",
              "sheet": "Stückzahlen",
              "row": 1,
              "col": 1,
              "label": "Stückzahlen TVKL G60 G61 G90"
            }
          ]
        }
      }
    },
    {
      "file": "221012_Multi_QAF_MX (1).xlsx",
      "family": "MULTI_m_qaf_2_0",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Fertigungskosten",
        "Material",
        "Vgl Material",
        "Rüstkosten EU"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 22,
              "col": 7,
              "label": "Overhead & Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 28,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 16,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total",
            "unit_price"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 22,
              "col": 7,
              "label": "Overhead & Gewinn"
            },
            {
              "subfield": "unit_price",
              "sheet": "Zusammenfassung",
              "row": 36,
              "col": 12,
              "label": "`+0.5% auf Stückpreis"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 9,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 6,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material",
              "row": 11,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 16,
              "label": "Volumen Ø/a"
            }
          ]
        }
      }
    },
    {
      "file": "DELPHI CN QAF 65-RAD_AXR_28mm_UF_1T13b_C50_22K_628_509.xlsm",
      "family": "MULTI_qaf_8_1_custom_multi",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Legend",
        "Summary",
        "Local Procured Parts",
        "Imported Parts",
        "Raw Material",
        "Substantial Process Cost",
        "Other Process Cost",
        "Application Cost",
        "Special Direct Costs",
        "Tooling Cost (SBM)",
        "Sheet1"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Substantial Process Cost",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Substantial Process Cost",
              "row": 12,
              "col": 17,
              "label": "Cycle Time / Part\n[s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Substantial Process Cost",
              "row": 12,
              "col": 16,
              "label": "Number of direct Employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Substantial Process Cost",
              "row": 12,
              "col": 30,
              "label": "Machine Hour Rate \n[CU / h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Summary",
              "row": 25,
              "col": 28,
              "label": "ADP Eng., Ph.3 Eng., SG&A, Warranty, profit"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Summary",
              "row": 25,
              "col": 14,
              "label": "General Overhead and Profit [CU]"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 32,
              "col": 13,
              "label": "9. Scrap Cost"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Legend",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Legend",
              "row": 27,
              "col": 2,
              "label": "Local Procured Parts\n\n\"CIF Price of Sub-suppliers' Import Part with 40/40 Tier-2 LC Status in Currency of Quotation [CU]"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Legend",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Legend",
              "row": 37,
              "col": 4,
              "label": "Only the process cost happening during the substantial processing operations for producing the quoted component is count"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Legend",
              "row": 17,
              "col": 4,
              "label": "LC Manufacturing Cost                          =    Import Value + Local Value + Substantial Process Cost +  Substantial"
            }
          ]
        },
        "E_totals": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "missingSubfields": [
            "material_total"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_total",
              "sheet": "Summary",
              "row": 22,
              "col": 13,
              "label": "TOTAL MANUFACTURING COST [CU]"
            },
            {
              "subfield": "sga_total",
              "sheet": "Summary",
              "row": 25,
              "col": 28,
              "label": "ADP Eng., Ph.3 Eng., SG&A, Warranty, profit"
            },
            {
              "subfield": "profit_total",
              "sheet": "Summary",
              "row": 25,
              "col": 14,
              "label": "General Overhead and Profit [CU]"
            },
            {
              "subfield": "unit_price",
              "sheet": "Legend",
              "row": 21,
              "col": 4,
              "label": "Substantial SBM amortization cost        =   Total substantial SBM tooling amortized cost onto piece price by lifetime v"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 12,
              "label": "BMW Part No.:"
            },
            {
              "subfield": "supplier",
              "sheet": "Legend",
              "row": 15,
              "col": 4,
              "label": "* Also including CIF price of sub-suppliers' import component when the local supplied part's (tier 2) LC rate is < 40%"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 9,
              "col": 2,
              "label": "Quotation Date:"
            },
            {
              "subfield": "currency",
              "sheet": "Legend",
              "row": 27,
              "col": 2,
              "label": "Local Procured Parts\n\n\"CIF Price of Sub-suppliers' Import Part with 40/40 Tier-2 LC Status in Currency of Quotation [CU]"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 13,
              "col": 2,
              "label": "Total Volume +/- 20% \nPeak Volume per Year +/- 10%\nAnnotations"
            }
          ]
        }
      }
    },
    {
      "file": "Jit Matrix Vergabe.xlsx",
      "family": "AMBIGUOUS_unknown_multi_qaf",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Lenkungsinfo",
        "premise",
        "help",
        "Overview",
        "Matrix",
        "Matrix (Multicurrency)",
        "general",
        "assembly",
        "workers",
        "investment MGK",
        "PI",
        "startup costs",
        "material costs components",
        "gAMS_####",
        "Daten"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "help",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "inefficiency"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "machine_rate"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "assembly",
              "row": 7,
              "col": 2,
              "label": "cycle time & number of work stations (personal allowance included)"
            },
            {
              "subfield": "headcount",
              "sheet": "help",
              "row": 5,
              "col": 4,
              "label": "Name, adress and telephone number of responsible operator"
            },
            {
              "subfield": "inefficiency",
              "sheet": "help",
              "row": 23,
              "col": 1,
              "label": "efficiency line (%)"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "help",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "help",
              "row": 56,
              "col": 4,
              "label": "Costs for  OH, SG&A and profit. Will be added to the HK,  that means the sum out of material and production costs. See d"
            },
            {
              "subfield": "profit_pct",
              "sheet": "help",
              "row": 56,
              "col": 4,
              "label": "Costs for  OH, SG&A and profit. Will be added to the HK,  that means the sum out of material and production costs. See d"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "help",
              "row": 39,
              "col": 1,
              "label": "scrap rate"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Lenkungsinfo",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Lenkungsinfo",
              "row": 11,
              "col": 2,
              "label": "Fehlerkorrektur / Multiwährungsrechner"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "gAMS_####",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "gAMS_####",
              "row": 36,
              "col": 2,
              "label": "manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "help",
          "foundSubfields": [
            "sga_total",
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "help",
              "row": 56,
              "col": 4,
              "label": "Costs for  OH, SG&A and profit. Will be added to the HK,  that means the sum out of material and production costs. See d"
            },
            {
              "subfield": "profit_total",
              "sheet": "help",
              "row": 56,
              "col": 4,
              "label": "Costs for  OH, SG&A and profit. Will be added to the HK,  that means the sum out of material and production costs. See d"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Lenkungsinfo",
          "foundSubfields": [
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "part_number"
          ],
          "evidence": [
            {
              "subfield": "supplier",
              "sheet": "Lenkungsinfo",
              "row": 3,
              "col": 2,
              "label": "Vorlage-JIT Angebotsmatrix Lieferant ENG"
            },
            {
              "subfield": "date",
              "sheet": "Lenkungsinfo",
              "row": 9,
              "col": 3,
              "label": "Ersteller\nKurzzeichen\nDatum"
            },
            {
              "subfield": "currency",
              "sheet": "Lenkungsinfo",
              "row": 11,
              "col": 2,
              "label": "Fehlerkorrektur / Multiwährungsrechner"
            },
            {
              "subfield": "volume",
              "sheet": "premise",
              "row": 6,
              "col": 4,
              "label": "Die im Anfrageschreiben vorgegebene Planvolumen sind im Regelprozess abzubilden. Bedarfsschwankungen und Bedarfsspitzen "
            }
          ]
        }
      }
    },
    {
      "file": "Kopie von 2026.01.16 - DCD 059 - ASM470 - Agreed - PUR Glue + Spkr Brkt + Spkr Bezel - QAF G65 05.04.23 Less Directed.xlsx",
      "family": "MULTI_qaf_8_1_custom_multi",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Summary",
        "Material",
        "Manufactering costs",
        "SBM-devices-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Raw material risks",
        "Assumptions sheet",
        "Assumptions sheet raw material",
        "Protokoll",
        "Document Control",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Summary",
              "row": 23,
              "col": 12,
              "label": "Profit"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 18,
              "col": 7,
              "label": "Scrap costs"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Summary",
              "row": 12,
              "col": 7,
              "label": "Manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Summary",
              "row": 23,
              "col": 12,
              "label": "Profit"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Summary",
              "row": 5,
              "col": 2,
              "label": "Supplier editor:"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 14,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "Multi-QAF_ClarWE2T_NAFTA_EPSapa_ivar_iconst_G4x_G5x_hb_2020-02-18_V01_STC.xlsx",
      "family": "MULTI_m_qaf_1_0",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Fertigungskosten",
        "Material",
        "SBM-Vorrichtungen-FWZ",
        "SBM-devices-FWZ",
        "Rüstkosten EU"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 22,
              "col": 7,
              "label": "Overhead & Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 28,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Material",
          "foundSubfields": [
            "material_list",
            "currency"
          ],
          "missingSubfields": [
            "unit_cost"
          ],
          "evidence": [
            {
              "subfield": "material_list",
              "sheet": "Material",
              "row": 56,
              "col": 5,
              "label": "BoM Gesamt"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 16,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 22,
              "col": 7,
              "label": "Overhead & Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 9,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 6,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material",
              "row": 12,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 9,
              "col": 16,
              "label": "Stückzahlen (lifetime)"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_EU_NCAR-only_EPSapa_hb_2021-11-05_V01_STC.xlsx",
      "family": "MULTI_m_qaf_1_0",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Fertigungskosten",
        "Material",
        "Rüstkosten EU"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 21,
              "col": 7,
              "label": "Overhead & Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 27,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 15,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 21,
              "col": 7,
              "label": "Overhead & Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material",
              "row": 11,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 11,
              "col": 16,
              "label": "Volumen Ø/a"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_FBK_G20-G22 20P_Quote 3_20131002.xls",
      "family": "LEGACY_XLS_UNSUPPORTED",
      "ok": false,
      "error": "Can't find end of central directory : is this a zip file ? If it is, see https://stuk.github.io/jszip/documentation/howto/read_zip.html",
      "sheetNames": [],
      "fieldGroups": null
    },
    {
      "file": "QAF_FBK_G20-G22 40P LH_Quote 3_20131002.xls",
      "family": "LEGACY_XLS_UNSUPPORTED",
      "ok": false,
      "error": "Can't find end of central directory : is this a zip file ? If it is, see https://stuk.github.io/jszip/documentation/howto/read_zip.html",
      "sheetNames": [],
      "fieldGroups": null
    },
    {
      "file": "aktualisierte JIT Matrix Raskin.xlsx",
      "family": "AMBIGUOUS_unknown_multi_qaf",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Lenkungsinfo",
        "premise",
        "help",
        "Overview",
        "Matrix",
        "Matrix (Multicurrency)",
        "general",
        "assembly",
        "workers",
        "investment MGK",
        "PI",
        "startup costs",
        "material costs components",
        "gAMS_####",
        "Daten"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "help",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "inefficiency"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "machine_rate"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "assembly",
              "row": 7,
              "col": 2,
              "label": "cycle time & number of work stations (personal allowance included)"
            },
            {
              "subfield": "headcount",
              "sheet": "help",
              "row": 5,
              "col": 4,
              "label": "Name, adress and telephone number of responsible operator"
            },
            {
              "subfield": "inefficiency",
              "sheet": "help",
              "row": 23,
              "col": 1,
              "label": "efficiency line (%)"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "help",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "help",
              "row": 56,
              "col": 4,
              "label": "Costs for  OH, SG&A and profit. Will be added to the HK,  that means the sum out of material and production costs. See d"
            },
            {
              "subfield": "profit_pct",
              "sheet": "help",
              "row": 56,
              "col": 4,
              "label": "Costs for  OH, SG&A and profit. Will be added to the HK,  that means the sum out of material and production costs. See d"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "help",
              "row": 39,
              "col": 1,
              "label": "scrap rate"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Lenkungsinfo",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Lenkungsinfo",
              "row": 11,
              "col": 2,
              "label": "Fehlerkorrektur / Multiwährungsrechner"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "gAMS_####",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "gAMS_####",
              "row": 36,
              "col": 2,
              "label": "manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "help",
          "foundSubfields": [
            "sga_total",
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "help",
              "row": 56,
              "col": 4,
              "label": "Costs for  OH, SG&A and profit. Will be added to the HK,  that means the sum out of material and production costs. See d"
            },
            {
              "subfield": "profit_total",
              "sheet": "help",
              "row": 56,
              "col": 4,
              "label": "Costs for  OH, SG&A and profit. Will be added to the HK,  that means the sum out of material and production costs. See d"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Lenkungsinfo",
          "foundSubfields": [
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "part_number"
          ],
          "evidence": [
            {
              "subfield": "supplier",
              "sheet": "Lenkungsinfo",
              "row": 3,
              "col": 2,
              "label": "Vorlage-JIT Angebotsmatrix Lieferant ENG"
            },
            {
              "subfield": "date",
              "sheet": "Lenkungsinfo",
              "row": 9,
              "col": 3,
              "label": "Ersteller\nKurzzeichen\nDatum"
            },
            {
              "subfield": "currency",
              "sheet": "Lenkungsinfo",
              "row": 11,
              "col": 2,
              "label": "Fehlerkorrektur / Multiwährungsrechner"
            },
            {
              "subfield": "volume",
              "sheet": "premise",
              "row": 6,
              "col": 4,
              "label": "Die im Anfrageschreiben vorgegebene Planvolumen sind im Regelprozess abzubilden. Bedarfsschwankungen und Bedarfsspitzen "
            }
          ]
        }
      }
    },
    {
      "file": "1_1_FT_ZV_Vergabe_Kiekert_20230214 QAF H2 eO 11 Mio FTL ZV_fin.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Material",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Material",
              "row": 24,
              "col": 3,
              "label": "AVH outside operation lever"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "201026_QAF_U10_C_Säule unten PHEV 5A1F805_06_sw.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "240701_FAS_BK5_QAF_Cushion 3D8W Power Memo_Q4 2023-75,30Ç to 82,21Ç-new.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Allgemeiner Overhead und Gewinn  [WE]"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Allgemeiner Overhead und Gewinn  [WE]"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 11,
              "col": 2,
              "label": "Gesamtvolumen \"LIST_200602_Volumen_BK5_Entwicklung_v9_Faurecia\"\nWeitere Prämissen sind in dem Verhandlungsprotokoll und "
            }
          ]
        }
      }
    },
    {
      "file": "260220_5A20827_Abstützung_Einlegeboden_Fortschreibung_LTA.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "260220_5A6F8B5_ZB_Abdeckung_Querträger_Fortschreibung_LTA.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "Annex_14.3_Quotation_Analysis_Form_Scenario 1A_DerivatG65_290922.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "Lieferant_1_BT_1 4.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "O/H + Profit"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "O/H + Profit"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "NCAR ECM QAF R3.1 Sc4 SKW - Radiator HTK BMW AG - Update.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material",
              "row": 8,
              "col": 4,
              "label": "Invalid Date"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P03_200914_5A174F1_ZB_LI_BLENDE_B-SAEULE_OBEN_ECE_US.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V (7%/11%) + Gewinn (4%/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V (7%/11%) + Gewinn (4%/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P06_201020_5A1CEE8_ZB_VKL_HKL_unten inkl. SI aus Flockenverbund.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P09_260220_5A18335_ZB_LI_BLENDE_C-SAEULE_UNTEN_Fortschreibung_LTA.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V (7%/11%) + Gewinn (4%/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V (7%/11%) + Gewinn (4%/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P13_201020_5A20827_Abstützung_Einlegeboden.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P16_260220_5A18328_ZB_RE_SEITENVERKLEIDUNG_VORN_LL_Fortschreibung_LTA.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P19_201020_5A20887_Li_Verkleidung_Brüstung.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P22_201020_5A20892_Re_Blende_Gurtaustritt.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P25_260220_5A18347_LI_ABDICHTUNG_SEITENRAHMEN_TUERFUGE_Fortschreibung_LTA.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P30_260220_5A0DEF4_ZB_VERKLEIDUNG_OBEN_A.F_Fortschreibung_LTA.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "P35_260220_5A174F0_ADAPTER_HIMMEL_A.F_Fortschreibung_LTA.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "V&V(7%/11%)+Gewinn(4%)/11%)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF 5A36B68 ZB BVKL VORN BASIS LL A.F._G6x_Auria - MSS UPDATE MZ + RFGK + OEE heute+ DL Split.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Zusammenfassung",
              "row": 7,
              "col": 13,
              "label": "MSS UPDATE MZ + RFGK + OEE heute + DL Split"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "058 - Autoliv_Runde_13_EU_QAF_SW_CLAR WE M_Sportlenkrad_Base08_09_nomination_20190730.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "OH incl. profit"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "OH incl. profit"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material",
              "row": 8,
              "col": 4,
              "label": "Invalid Date"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "180131_7489847_48_ZB LI RE VERKLEIDUNG BRUESTUNG V2.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Dokumentenlenkung",
              "row": 12,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Dokumentenlenkung",
              "row": 12,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Dokumentenlenkung",
              "row": 9,
              "col": 3,
              "label": "Ersteller\nKurzzeichen\nDatum"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "180131_7490759_60_BLENDE B-SAEULE UNTEN.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Dokumentenlenkung",
              "row": 12,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Dokumentenlenkung",
              "row": 12,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Dokumentenlenkung",
              "row": 9,
              "col": 3,
              "label": "Ersteller\nKurzzeichen\nDatum"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "180131_7942946_ZB BEDIENINSEL BASIS.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Dokumentenlenkung",
              "row": 12,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Dokumentenlenkung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Dokumentenlenkung",
              "row": 12,
              "col": 2,
              "label": "Zusammenfassungsblatt\nZuschläge, sonstige Zuschläge und Gewinn werden unter der neuen Position \"Sonstige Zuschläge\" zusa"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Dokumentenlenkung",
              "row": 9,
              "col": 3,
              "label": "Ersteller\nKurzzeichen\nDatum"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_BFS_Basis_LL_KST_silber_matt_Aug.23.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Zusammenfassung",
              "row": 28,
              "col": 24,
              "label": "MSS SPG"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_BFS_SA_LL__ALU_gebürstet_230901.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_FS_SA_LL_OPO_Eukalyptus_RIK_Aug.23.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Zusammenfassung",
              "row": 28,
              "col": 21,
              "label": "Zykluszeiten/Auslegung"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Zusammenfassung",
              "row": 28,
              "col": 23,
              "label": "MSS"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "sga_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Fertigungskosten",
              "row": 31,
              "col": 3,
              "label": "neuer Arbeitsgang hinzu"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "sga_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "Fertigungskosten",
              "row": 31,
              "col": 3,
              "label": "neuer Arbeitsgang hinzu"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_TV_li_LL_SA_ALU_Graphikakzent_230901.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "171201_QAF_Hi-LEX EA4238_ BMW U06 front door.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Summary",
        "Material",
        "Manufacturing costs",
        "SBM-SEKOF-FWZ",
        "Raw material risks",
        "Assumptions sheet",
        "Assumptions sheet SBM",
        "Assumptions sheet raw material",
        "Tabelle3",
        "Protokoll",
        "Document Control",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Manufacturing costs",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Manufacturing costs",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Manufacturing costs",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Manufacturing costs",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Manufacturing costs",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Assumptions sheet SBM",
              "row": 40,
              "col": 33,
              "label": "Chhaattisgarh"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Summary",
              "row": 22,
              "col": 11,
              "label": "Explanation: overheads and profit"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 18,
              "col": 7,
              "label": "Scrap costs"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 23,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Manufacturing costs",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Manufacturing costs",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Summary",
              "row": 12,
              "col": 7,
              "label": "Manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "Assumptions sheet SBM",
          "foundSubfields": [
            "sga_total",
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "Assumptions sheet SBM",
              "row": 40,
              "col": 33,
              "label": "Chhaattisgarh"
            },
            {
              "subfield": "profit_total",
              "sheet": "Summary",
              "row": 22,
              "col": 11,
              "label": "Explanation: overheads and profit"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Summary",
              "row": 5,
              "col": 2,
              "label": "Supplier editor:"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 23,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 13,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "1_FT_links_aktuell_Brose_QAF_B-Schloss_FT_links_ZV_20260324.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "SUMMARY",
        "LC-CN",
        "MATERIAL",
        "MANUFACTURING COSTS",
        "SBM-DEVICES-FWZ",
        "RAW MATERIAL RISKS",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Auswahlfeld",
        "A1",
        "TcPCM",
        "Dokumentenlenkung"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Auswahlfeld",
          "foundSubfields": [
            "sga_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Auswahlfeld",
              "row": 37,
              "col": 3,
              "label": "Ammonia US, \"Ammonia - Fertilizer CFR USG Assessment Spot 0-8 Weeks Full Market Range Weekly (Mid)\", USD/t (ICIS)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "SUMMARY",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten *"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "SUMMARY",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "SUMMARY",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten *"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Auswahlfeld",
          "foundSubfields": [
            "sga_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "Auswahlfeld",
              "row": 37,
              "col": 3,
              "label": "Ammonia US, \"Ammonia - Fertilizer CFR USG Assessment Spot 0-8 Weeks Full Market Range Weekly (Mid)\", USD/t (ICIS)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "SUMMARY",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "SUMMARY",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "SUMMARY",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "A1",
              "row": 18,
              "col": 3,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "SUMMARY",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "SUMMARY",
              "row": 12,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "2020_12_01_BMW G45_RD#5.2_QAF_#504_MFS 400W Diesel_ZA.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Summary",
        "Material",
        "Manufactering costs",
        "SBM-devices-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Raw material risks",
        "Assumptions sheet",
        "Assumptions sheet raw material",
        "Protokoll",
        "Document Control",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 18,
              "col": 7,
              "label": "Scrap costs"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Summary",
              "row": 12,
              "col": 7,
              "label": "Manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Summary",
              "row": 5,
              "col": 2,
              "label": "Supplier editor:"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 14,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "2020_12_01_BMW G45_RD#5.2_QAF_#905_Diesel_400W_ZA.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Summary",
        "Material",
        "Manufactering costs",
        "SBM-devices-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Raw material risks",
        "Assumptions sheet",
        "Assumptions sheet raw material",
        "Protokoll",
        "Document Control",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 18,
              "col": 7,
              "label": "Scrap costs"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Summary",
              "row": 12,
              "col": 7,
              "label": "Manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Summary",
              "row": 5,
              "col": 2,
              "label": "Supplier editor:"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 14,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "20240731_BMW G45_RD#5.2_QAF_#702_ATOC 26-104_NA for ZA Trade Agreement.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Summary",
        "Material",
        "Manufactering costs",
        "SBM-devices-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Raw material risks",
        "Assumptions sheet",
        "Assumptions sheet raw material",
        "Protokoll",
        "Document Control",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 18,
              "col": 7,
              "label": "Scrap costs"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Summary",
              "row": 12,
              "col": 7,
              "label": "Manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Summary",
              "row": 5,
              "col": 2,
              "label": "Supplier editor:"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 14,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "2_HT_links_aktuell_Brose_QAF_B-Schloss_HT_links_3.MKS_Kisi_20260324.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "SUMMARY",
        "LC-CN",
        "MATERIAL",
        "MANUFACTURING COSTS",
        "SBM-DEVICES-FWZ",
        "RAW MATERIAL RISKS",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Auswahlfeld",
        "A1",
        "TcPCM",
        "Dokumentenlenkung"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Auswahlfeld",
          "foundSubfields": [
            "sga_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Auswahlfeld",
              "row": 37,
              "col": 3,
              "label": "Ammonia US, \"Ammonia - Fertilizer CFR USG Assessment Spot 0-8 Weeks Full Market Range Weekly (Mid)\", USD/t (ICIS)"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "SUMMARY",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten *"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "SUMMARY",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "SUMMARY",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten *"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Auswahlfeld",
          "foundSubfields": [
            "sga_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "Auswahlfeld",
              "row": 37,
              "col": 3,
              "label": "Ammonia US, \"Ammonia - Fertilizer CFR USG Assessment Spot 0-8 Weeks Full Market Range Weekly (Mid)\", USD/t (ICIS)"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "SUMMARY",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "SUMMARY",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "SUMMARY",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "A1",
              "row": 18,
              "col": 3,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "SUMMARY",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "SUMMARY",
              "row": 12,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "Lieferant_2_BT_5 3.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Summary",
        "Material",
        "Manufactering costs",
        "SBM-devices-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Raw material risks",
        "Assumptions sheet",
        "Assumptions sheet raw material",
        "Protokoll",
        "Document Control",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 18,
              "col": 7,
              "label": "Scrap costs"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Manufactering costs",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Manufactering costs",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Summary",
              "row": 12,
              "col": 7,
              "label": "Manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Summary",
              "row": 5,
              "col": 2,
              "label": "Supplier editor:"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 14,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF 5A20884.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Summary",
        "Material",
        "Manufactoring costs",
        "SBM-devices-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Raw material risks",
        "Assumptions sheet",
        "Assumptions sheet raw material",
        "Protokoll",
        "Document Control",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Manufactoring costs",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Manufactoring costs",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Manufactoring costs",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Manufactoring costs",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Manufactoring costs",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 18,
              "col": 7,
              "label": "Scrap costs"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Manufactoring costs",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Manufactoring costs",
              "row": 11,
              "col": 22,
              "label": "Scrap per process step [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Summary",
              "row": 12,
              "col": 7,
              "label": "Manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Summary",
              "row": 5,
              "col": 2,
              "label": "Supplier editor:"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Summary",
              "row": 24,
              "col": 4,
              "label": "Exchange rates for order currency [AW1]\n(for info purposes only)"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 14,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "20221103_QAF HEAT II Skyfall_sent out.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Legend",
        "Summary",
        "Local Material",
        "Imported Material",
        "Raw Material",
        "Substantial Manufacturing",
        "Other Manufacturing",
        "Substantial SBM-Devices-FWZ",
        "Other SBM-Devices-FWZ",
        "Assumptions sheet SBM",
        "SBM inventory",
        "Document Control",
        "Assumptions sheet"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Substantial Manufacturing",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Assumptions sheet SBM",
          "foundSubfields": [
            "sga_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Assumptions sheet SBM",
              "row": 40,
              "col": 33,
              "label": "Chhaattisgarh"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 30,
              "col": 7,
              "label": "Scrap imputed cost"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Legend",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Legend",
              "row": 27,
              "col": 2,
              "label": "Locally Procured Parts\n\n\"CIF Cost of Sub-suppliers' Import Part with 40/40 Tier-2 LC Status in Currency of Quotation [CU"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Legend",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Legend",
              "row": 37,
              "col": 4,
              "label": "Only the process cost happening during the substantial processing operations for producing the quoted component is count"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Local Material",
              "row": 25,
              "col": 3,
              "label": "zus. Fertigungskosten Getriebe inkl. Fertigungsoverhead"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "Assumptions sheet SBM",
          "foundSubfields": [
            "sga_total",
            "unit_price"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "profit_total"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "Assumptions sheet SBM",
              "row": 40,
              "col": 33,
              "label": "Chhaattisgarh"
            },
            {
              "subfield": "unit_price",
              "sheet": "Legend",
              "row": 21,
              "col": 4,
              "label": "Substantial SBM amortization cost        =   Total substantial SBM tooling amortized imputed cost onto piece price by li"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Legend",
              "row": 15,
              "col": 4,
              "label": "* Also including CIF cost of sub-suppliers' import component when the local supplied part's (tier 2) LC rate is < 40%"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Legend",
              "row": 27,
              "col": 2,
              "label": "Locally Procured Parts\n\n\"CIF Cost of Sub-suppliers' Import Part with 40/40 Tier-2 LC Status in Currency of Quotation [CU"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 21,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "20260622_Fenstervlieskanaele_BFS_aus_Northeim_FORM_aktuell_Quotation_Analysis_Form_QAF_de_BMW_8609687567722615550.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "SUMMARY",
        "LC-CN",
        "MATERIAL",
        "MANUFACTURING COSTS",
        "SBM-DEVICES-FWZ",
        "RAW MATERIAL RISKS",
        "CO2e POTENTIAL _",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Auswahlfeld",
        "TcPCM",
        "A1",
        "Dokumentenlenkung"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "SUMMARY",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "CO2e POTENTIAL _",
              "row": 7,
              "col": 9,
              "label": "Ausgangssituation"
            },
            {
              "subfield": "profit_pct",
              "sheet": "SUMMARY",
              "row": 23,
              "col": 12,
              "label": "Profit on Margin"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "SUMMARY",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten *"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "SUMMARY",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "MANUFACTURING COSTS",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "MANUFACTURING COSTS",
              "row": 15,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "SUMMARY",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten *"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "CO2e POTENTIAL _",
          "foundSubfields": [
            "sga_total",
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "CO2e POTENTIAL _",
              "row": 7,
              "col": 9,
              "label": "Ausgangssituation"
            },
            {
              "subfield": "profit_total",
              "sheet": "SUMMARY",
              "row": 23,
              "col": 12,
              "label": "Profit on Margin"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "SUMMARY",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "SUMMARY",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "SUMMARY",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "SUMMARY",
              "row": 17,
              "col": 19,
              "label": "Datum der PCF Kalkulation"
            },
            {
              "subfield": "currency",
              "sheet": "SUMMARY",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "SUMMARY",
              "row": 12,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_GEN5 PHEV R7 - SP52_Bundle_Coolers_20191211_repricing-20240220 – Kopie.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "LME-Weight_LTA-Table",
        "Machine hourly rate",
        "Material_CP44",
        "Material_xx",
        "Material_x",
        "Fertigungskosten_CP44",
        "Fertigungskosten_xx",
        "Fertigungskosten_x",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Temp",
        "SEKOF_amort"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten_CP44",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten_CP44",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten_CP44",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Machine hourly rate",
              "row": 4,
              "col": 2,
              "label": "MSS Version 8.4_01_01 © BMW AG"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_CP44",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten_CP44",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Machine hourly rate",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Machine hourly rate",
              "row": 7,
              "col": 8,
              "label": "Load rate [%]\n based on operational time"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material_CP44",
              "row": 8,
              "col": 4,
              "label": "Invalid Date"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_GEN5 PHEV R7 - SP54_Bundle_Coolers_20191211_repricing-20240220.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "LME-Weight_LTA-Table",
        "Machine hourly rate",
        "Material_CP16F",
        "Material_CP16R",
        "Material_CP12",
        "Fertigungskosten_CP16F",
        "Fertigungskosten_CP16R",
        "Fertigungskosten_CP12",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Temp",
        "SEKOF_amort"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten_CP16F",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten_CP16F",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten_CP16F",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Machine hourly rate",
              "row": 4,
              "col": 2,
              "label": "MSS Version 8.4_01_01 © BMW AG"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "labour_rate",
              "sheet": "Zusammenfassung",
              "row": 38,
              "col": 5,
              "label": "Labour Rate for 2024"
            },
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_CP16F",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten_CP16F",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Machine hourly rate",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Machine hourly rate",
              "row": 7,
              "col": 8,
              "label": "Load rate [%]\n based on operational time"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material_CP16F",
              "row": 8,
              "col": 4,
              "label": "Invalid Date"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "20260319_CREATOR_BASIS_KKL_Quotation_Analysis_Form_QAF_de_Rev03_V06 (1).xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "PI-Rechner",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 12,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 7,
              "label": "SG&A"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 17,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 24,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 7,
              "label": "SG&A"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "CREATOR_SPORT_KKL_Quotation_Analysis_Form_QAF_de_Rev03_V08[28].xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "SBM_Matrix",
        "SBM_Dropdown",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "PI-Rechner",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 13,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "240118_Annex 1_G60_G90.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "Details LEK",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Restgemeinkosten und Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Restgemeinkosten und Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "240118_Annex 3_G60_G90.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-Vorrichtungen-FWZ",
        "Details LEK",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Dokumentenlenkung",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Restgemeinkosten und Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Restgemeinkosten und Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_GEN5 PHEV R7 - SP52_Bundle_Coolers_20191211 - Updated-Labour&Energy-adder_230816.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "LME-Weight_LTA-Table",
        "Material_CP44",
        "Material_xx",
        "Material_x",
        "Fertigungskosten_CP44",
        "Fertigungskosten_xx",
        "Fertigungskosten_x",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Temp",
        "SEKOF_amort"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten_CP44",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten_CP44",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten_CP44",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten_CP44",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_CP44",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten_CP44",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_CP44",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten_CP44",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material_CP44",
              "row": 8,
              "col": 4,
              "label": "Invalid Date"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_GEN5 PHEV R7 - SP56_Bundle_Coolers_20191211 - Updated-labour&energy-adder_230816.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "LME-Weight_LTA-Table",
        "Material_CP16",
        "Material_CP40",
        "Material_x",
        "Fertigungskosten_CP16",
        "Fertigungskosten_CP40",
        "Fertigungskosten_x",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Temp",
        "SEKOF_amort"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten_CP16",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten_CP16",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten_CP16",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten_CP16",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_CP16",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten_CP16",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_CP16",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten_CP16",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material_CP16",
              "row": 8,
              "col": 4,
              "label": "Invalid Date"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "151120_QAF M Sport SW.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Vertriebs- und Verwaltungsgemeinkosten"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 26,
              "col": 7,
              "label": "Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 22,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 26,
              "col": 7,
              "label": "Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF 7952136 - BV vo LL ICE U06, U11, U25 - Stand Ist.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Material",
        "Fertigungskosten",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Temp"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "8% V&V + 4% Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "8% V&V + 4% Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "20240325_QAF_BMW-G70_ver17_Plant data 28032025.xlsm",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Prämissenblatt",
        "Übersicht",
        "Deckblatt",
        "Übersicht Angebot",
        "Kalkulation",
        "Umlageschema-SEKOF Vergabe",
        "Umlageschema-SEKOF  TT ALEV3&4",
        "Umlageschema-SEKOF  TT ALEV hin",
        "Umlageschema-SEKOF eSSR Deliver",
        "Umlageschema-SEKOF Smartbar",
        "Umlage-SEKOF Heizung Insert",
        "Umlageschema-SEKOF AT3452 licht",
        "Umlage-SEKOF GAMS AT 1066",
        "Umlage-SEKOF GAMS AT5408",
        "Umlage-SEKOF GAMS AT9476",
        "Umlage-LEK-Steppung MERINO 18%",
        "Umlage-SEKOF Steppung MERINO18%",
        "Umlageschema-SEKOF TPO",
        "Umlageschema-SEKOF Leder",
        "Lohnsatz",
        "Verzinsung LEK",
        "Umlage-SEKOF Griffmulde Licht",
        "Umlage-SEKOF Licht Insert Leder",
        "Umlage-SEKOF Blende Notentr",
        "Umlage-SEKOF Blende TiT"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "Kalkulation",
          "foundSubfields": [
            "cycle_time",
            "headcount"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Kalkulation",
              "row": 12,
              "col": 39,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Kalkulation",
              "row": 14,
              "col": 3,
              "label": "LOGISTIK + Direkte Mitarbeiter Vordertuer/ \nLOGISTIC + MOD front door"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Lohnsatz",
          "foundSubfields": [
            "labour_rate",
            "scrap_pct"
          ],
          "missingSubfields": [
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "labour_rate",
              "sheet": "Lohnsatz",
              "row": 1,
              "col": 1,
              "label": "Lohnsatz BMW G70"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Kalkulation",
              "row": 12,
              "col": 22,
              "label": "Materialausschuss [%]"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Prämissenblatt",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Prämissenblatt",
              "row": 6,
              "col": 5,
              "label": "Liste der zulässigen Angebotswährungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Prämissenblatt",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "Prämissenblatt",
              "row": 13,
              "col": 32,
              "label": "WZ_IH_Kosten aus Fertigungskosten entfernt"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Übersicht",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Übersicht",
              "row": 8,
              "col": 7,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Übersicht",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Umlageschema-SEKOF Vergabe",
              "row": 4,
              "col": 13,
              "label": "Date"
            },
            {
              "subfield": "currency",
              "sheet": "Prämissenblatt",
              "row": 6,
              "col": 5,
              "label": "Liste der zulässigen Angebotswährungen"
            },
            {
              "subfield": "volume",
              "sheet": "Übersicht",
              "row": 11,
              "col": 7,
              "label": "Gesamt-Stückzahl"
            }
          ]
        }
      }
    },
    {
      "file": "240301_QAF_BMW-G70_ver16.xlsm",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Prämissenblatt",
        "Übersicht",
        "Deckblatt",
        "Übersicht Angebot",
        "Kalkulation",
        "Umlageschema-SEKOF Vergabe",
        "Umlageschema-SEKOF  TT ALEV3&4",
        "Umlageschema-SEKOF  TT ALEV hin",
        "Umlageschema-SEKOF eSSR Deliver",
        "Umlageschema-SEKOF Smartbar",
        "Umlage-SEKOF Heizung Insert",
        "Umlageschema-SEKOF AT3452 licht",
        "Umlage-SEKOF GAMS AT 1066",
        "Umlage-SEKOF GAMS AT5408",
        "Umlage-SEKOF GAMS AT9476",
        "Umlage-LEK-Steppung MERINO 18%",
        "Umlage-SEKOF Steppung MERINO18%",
        "Umlageschema-SEKOF TPO",
        "Umlageschema-SEKOF Leder",
        "Lohnsatz",
        "Verzinsung LEK",
        "Umlage-SEKOF Griffmulde Licht",
        "Umlage-SEKOF Licht Insert Leder",
        "Umlage-SEKOF Blende Notentr",
        "Umlage-SEKOF Blende TiT"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "Kalkulation",
          "foundSubfields": [
            "cycle_time",
            "headcount"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Kalkulation",
              "row": 12,
              "col": 39,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Kalkulation",
              "row": 14,
              "col": 3,
              "label": "LOGISTIK + Direkte Mitarbeiter Vordertuer/ \nLOGISTIC + MOD front door"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Lohnsatz",
          "foundSubfields": [
            "labour_rate",
            "scrap_pct"
          ],
          "missingSubfields": [
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "labour_rate",
              "sheet": "Lohnsatz",
              "row": 1,
              "col": 1,
              "label": "Lohnsatz BMW G70"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Kalkulation",
              "row": 12,
              "col": 22,
              "label": "Materialausschuss [%]"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Prämissenblatt",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Prämissenblatt",
              "row": 6,
              "col": 5,
              "label": "Liste der zulässigen Angebotswährungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Prämissenblatt",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "Prämissenblatt",
              "row": 13,
              "col": 32,
              "label": "WZ_IH_Kosten aus Fertigungskosten entfernt"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Übersicht",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Übersicht",
              "row": 8,
              "col": 7,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Übersicht",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Umlageschema-SEKOF Vergabe",
              "row": 4,
              "col": 13,
              "label": "Date"
            },
            {
              "subfield": "currency",
              "sheet": "Prämissenblatt",
              "row": 6,
              "col": 5,
              "label": "Liste der zulässigen Angebotswährungen"
            },
            {
              "subfield": "volume",
              "sheet": "Übersicht",
              "row": 11,
              "col": 7,
              "label": "Gesamt-Stückzahl"
            }
          ]
        }
      }
    },
    {
      "file": "20230706_QAF SW_G26_Werksersatz.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Kalkulation",
        "Prämissenblatt"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": []
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Vertriebs- und Verwaltungsgemeinkosten"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 26,
              "col": 7,
              "label": "Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 22,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 26,
              "col": 7,
              "label": "Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "20230706_QAF SW_G26_Werksersatz_Formatkorrigiert.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Kalkulation",
        "Prämissenblatt"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": []
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Vertriebs- und Verwaltungsgemeinkosten"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 26,
              "col": 7,
              "label": "Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 22,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 26,
              "col": 7,
              "label": "Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "date"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "20240325_QAF_I20_DP_wb_OF_2024_Plant Data 28032025.xlsm",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Prämissenblatt",
        "Übersicht Angebot Runde 9",
        "Kalkulation",
        "Optionen Übersicht",
        "Deckblatt",
        "Umlageschema PI I20",
        "Umlageschema 18h I20DP",
        "Umlageschema Sekof Heizung",
        "Umlageschema Sekof Akzentleiste",
        "Umlageschema Sekof I20DP Kabel"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Kalkulation",
          "foundSubfields": [
            "cycle_time"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Kalkulation",
              "row": 12,
              "col": 40,
              "label": "Zykluszeit [s]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Kalkulation",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Kalkulation",
              "row": 12,
              "col": 22,
              "label": "Materialausschuss [%]"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Prämissenblatt",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Prämissenblatt",
              "row": 6,
              "col": 5,
              "label": "Liste der zulässigen Angebotswährungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Prämissenblatt",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "Prämissenblatt",
              "row": 13,
              "col": 32,
              "label": "WZ_IH_Kosten aus Fertigungskosten entfernt"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Übersicht Angebot Runde 9",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Kalkulation",
              "row": 8,
              "col": 7,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Übersicht Angebot Runde 9",
              "row": 5,
              "col": 26,
              "label": "Name Lieferant / Supplier"
            },
            {
              "subfield": "date",
              "sheet": "Übersicht Angebot Runde 9",
              "row": 6,
              "col": 26,
              "label": "Angebotsdatum /Offer Date"
            },
            {
              "subfield": "currency",
              "sheet": "Prämissenblatt",
              "row": 6,
              "col": 5,
              "label": "Liste der zulässigen Angebotswährungen"
            },
            {
              "subfield": "volume",
              "sheet": "Übersicht Angebot Runde 9",
              "row": 6,
              "col": 6,
              "label": "Stückzahl über Laufzeit /  Lifetime Volume"
            }
          ]
        }
      }
    },
    {
      "file": "240301_QAF_BMW-I20.xlsm",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Prämissenblatt",
        "Übersicht Angebot Runde 9",
        "Kalkulation",
        "Optionen Übersicht",
        "Deckblatt",
        "Umlageschema PI I20",
        "Umlageschema 18h I20DP",
        "Umlageschema Sekof Heizung",
        "Umlageschema Sekof Akzentleiste",
        "Umlageschema Sekof I20DP Kabel"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Kalkulation",
          "foundSubfields": [
            "cycle_time"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Kalkulation",
              "row": 12,
              "col": 39,
              "label": "Zykluszeit [s]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Kalkulation",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Kalkulation",
              "row": 12,
              "col": 22,
              "label": "Materialausschuss [%]"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Prämissenblatt",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Prämissenblatt",
              "row": 6,
              "col": 5,
              "label": "Liste der zulässigen Angebotswährungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Prämissenblatt",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "Prämissenblatt",
              "row": 13,
              "col": 32,
              "label": "WZ_IH_Kosten aus Fertigungskosten entfernt"
            }
          ]
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Übersicht Angebot Runde 9",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Kalkulation",
              "row": 8,
              "col": 7,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Übersicht Angebot Runde 9",
              "row": 5,
              "col": 26,
              "label": "Name Lieferant / Supplier"
            },
            {
              "subfield": "date",
              "sheet": "Übersicht Angebot Runde 9",
              "row": 6,
              "col": 26,
              "label": "Angebotsdatum /Offer Date"
            },
            {
              "subfield": "currency",
              "sheet": "Prämissenblatt",
              "row": 6,
              "col": 5,
              "label": "Liste der zulässigen Angebotswährungen"
            },
            {
              "subfield": "volume",
              "sheet": "Übersicht Angebot Runde 9",
              "row": 6,
              "col": 6,
              "label": "Stückzahl über Laufzeit /  Lifetime Volume"
            }
          ]
        }
      }
    },
    {
      "file": "Autoliv_Runde_8_LC_QAF_BBA_ZB LR Creator Sport ohne Paddles CN_20230523.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Legend",
        "Summary",
        "Local Material",
        "Imported Material",
        "Raw Material",
        "Material Schlüssel",
        "Substantial Manufacturing",
        "Other Manufacturing",
        "Substantial SBM-Devices-FWZ",
        "Other SBM-Devices-FWZ",
        "Assumptions sheet SBM",
        "SBM inventory",
        "Document Control",
        "Assumptions sheet"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Substantial Manufacturing",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Assumptions sheet SBM",
          "foundSubfields": [
            "sga_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Assumptions sheet SBM",
              "row": 40,
              "col": 33,
              "label": "Chhaattisgarh"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 30,
              "col": 7,
              "label": "Scrap imputed cost"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Legend",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Legend",
              "row": 27,
              "col": 2,
              "label": "Locally Procured Parts\n\n\"CIF Cost of Sub-suppliers' Import Part with 40/40 Tier-2 LC Status in Currency of Quotation [CU"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Legend",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Legend",
              "row": 37,
              "col": 4,
              "label": "Only the process cost happening during the substantial processing operations for producing the quoted component is count"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Assumptions sheet",
              "row": 13,
              "col": 33,
              "label": "WZ_IH_Kosten removed from manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "Assumptions sheet SBM",
          "foundSubfields": [
            "sga_total",
            "unit_price"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "profit_total"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "Assumptions sheet SBM",
              "row": 40,
              "col": 33,
              "label": "Chhaattisgarh"
            },
            {
              "subfield": "unit_price",
              "sheet": "Legend",
              "row": 21,
              "col": 4,
              "label": "Substantial SBM amortization cost        =   Total substantial SBM tooling amortized imputed cost onto piece price by li"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Legend",
              "row": 15,
              "col": 4,
              "label": "* Also including CIF cost of sub-suppliers' import component when the local supplied part's (tier 2) LC rate is < 40%"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Legend",
              "row": 27,
              "col": 2,
              "label": "Locally Procured Parts\n\n\"CIF Cost of Sub-suppliers' Import Part with 40/40 Tier-2 LC Status in Currency of Quotation [CU"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 21,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "NCAR ECM QAF R3.1 Sc4 CHN - Radiator HTK BMW AG - Update.xlsx",
      "family": "QAF_V9_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Legend",
        "Summary",
        "Local Material",
        "Imported Material",
        "Raw Material",
        "Material Schlüssel",
        "Substantial Manufacturing",
        "Other Manufacturing",
        "Substantial SBM-Devices-FWZ",
        "Other SBM-Devices-FWZ",
        "Assumptions sheet SBM",
        "SBM inventory",
        "Document Control",
        "Assumptions sheet"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Substantial Manufacturing",
          "foundSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 8,
              "label": "Cycle time [s]"
            },
            {
              "subfield": "parts_per_cycle",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 9,
              "label": "Parts per cycle"
            },
            {
              "subfield": "headcount",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 10,
              "label": "Number of direct employees"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Substantial Manufacturing",
              "row": 11,
              "col": 13,
              "label": "Machine-hour rate\n (MSS) [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Assumptions sheet SBM",
          "foundSubfields": [
            "sga_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Assumptions sheet SBM",
              "row": 40,
              "col": 33,
              "label": "Chhaattisgarh"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Summary",
              "row": 30,
              "col": 7,
              "label": "Scrap imputed cost"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Legend",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Legend",
              "row": 27,
              "col": 2,
              "label": "Locally Procured Parts\n\n\"CIF Cost of Sub-suppliers' Import Part with 40/40 Tier-2 LC Status in Currency of Quotation [CU"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Legend",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Legend",
              "row": 37,
              "col": 4,
              "label": "Only the process cost happening during the substantial processing operations for producing the quoted component is count"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Assumptions sheet",
              "row": 13,
              "col": 33,
              "label": "WZ_IH_Kosten removed from manufacturing costs"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "Assumptions sheet SBM",
          "foundSubfields": [
            "sga_total",
            "unit_price"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "profit_total"
          ],
          "evidence": [
            {
              "subfield": "sga_total",
              "sheet": "Assumptions sheet SBM",
              "row": 40,
              "col": 33,
              "label": "Chhaattisgarh"
            },
            {
              "subfield": "unit_price",
              "sheet": "Legend",
              "row": 21,
              "col": 4,
              "label": "Substantial SBM amortization cost        =   Total substantial SBM tooling amortized imputed cost onto piece price by li"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Summary",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Summary",
              "row": 8,
              "col": 6,
              "label": "BMW Part Number:"
            },
            {
              "subfield": "supplier",
              "sheet": "Legend",
              "row": 15,
              "col": 4,
              "label": "* Also including CIF cost of sub-suppliers' import component when the local supplied part's (tier 2) LC rate is < 40%"
            },
            {
              "subfield": "date",
              "sheet": "Summary",
              "row": 8,
              "col": 2,
              "label": "Quotation date:"
            },
            {
              "subfield": "currency",
              "sheet": "Legend",
              "row": 27,
              "col": 2,
              "label": "Locally Procured Parts\n\n\"CIF Cost of Sub-suppliers' Import Part with 40/40 Tier-2 LC Status in Currency of Quotation [CU"
            },
            {
              "subfield": "volume",
              "sheet": "Summary",
              "row": 21,
              "col": 2,
              "label": "Total volume according to inquiry [parts]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF Vergleich STW Oberteil.xlsx",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Tabelle1"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": []
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.5,
          "dominantSheet": "Tabelle1",
          "foundSubfields": [
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct"
          ],
          "evidence": [
            {
              "subfield": "profit_pct",
              "sheet": "Tabelle1",
              "row": 23,
              "col": 17,
              "label": "Großteil der forderung aufgrund steigener Lohnkosten und dadurch entstehender Erhöhung des Overheads / Gewinns"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Tabelle1",
              "row": 12,
              "col": 2,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Tabelle1",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Tabelle1",
              "row": 4,
              "col": 8,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Tabelle1",
          "foundSubfields": [
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "process_step_name",
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "manufacturing_cost",
              "sheet": "Tabelle1",
              "row": 6,
              "col": 2,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Tabelle1",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Tabelle1",
              "row": 23,
              "col": 17,
              "label": "Großteil der forderung aufgrund steigener Lohnkosten und dadurch entstehender Erhöhung des Overheads / Gewinns"
            }
          ]
        },
        "F_meta": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "Tabelle1",
          "foundSubfields": [
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "part_number",
            "supplier",
            "date"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Tabelle1",
              "row": 4,
              "col": 8,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Tabelle1",
              "row": 21,
              "col": 2,
              "label": "Wochenendschichten für Peakvolumen"
            }
          ]
        }
      }
    },
    {
      "file": "Streulichtblenden AF25 inkl. CN Boost.xlsx",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Streulichtblenden"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": []
        },
        "B_master_rates": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "evidence": []
        },
        "C_material": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "unit_cost",
            "material_list",
            "currency"
          ],
          "evidence": []
        },
        "D_manufacturing_rows": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "process_step_name",
            "manufacturing_cost",
            "step_columns"
          ],
          "evidence": []
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Streulichtblenden",
          "foundSubfields": [
            "part_number"
          ],
          "missingSubfields": [
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Streulichtblenden",
              "row": 2,
              "col": 1,
              "label": "Sachnummer"
            }
          ]
        }
      }
    },
    {
      "file": "20180601_QAF_v3_Product_GES009_v009_offer_v9_Gestamp.xls",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [],
      "fieldGroups": {
        "A_process_params": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": []
        },
        "B_master_rates": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "evidence": []
        },
        "C_material": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "unit_cost",
            "material_list",
            "currency"
          ],
          "evidence": []
        },
        "D_manufacturing_rows": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "process_step_name",
            "manufacturing_cost",
            "step_columns"
          ],
          "evidence": []
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "evidence": []
        }
      }
    },
    {
      "file": "231201_Checkliste_Auftragsklärung_DE.xlsx",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Checkliste Vorklärung",
        "Lieferantenauswahl_V4",
        "Lieferantenauswahl_V3"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Checkliste Vorklärung",
          "foundSubfields": [
            "cycle_time"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Checkliste Vorklärung",
              "row": 9,
              "col": 5,
              "label": "Zykluszeiterhöhung an der Umschäumanlage / Plausibilisierung und Kapaabsicherung in 2025"
            }
          ]
        },
        "B_master_rates": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "evidence": []
        },
        "C_material": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "unit_cost",
            "material_list",
            "currency"
          ],
          "evidence": []
        },
        "D_manufacturing_rows": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "process_step_name",
            "manufacturing_cost",
            "step_columns"
          ],
          "evidence": []
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Checkliste Vorklärung",
          "foundSubfields": [
            "supplier",
            "date",
            "volume"
          ],
          "missingSubfields": [
            "part_number",
            "currency"
          ],
          "evidence": [
            {
              "subfield": "supplier",
              "sheet": "Checkliste Vorklärung",
              "row": 10,
              "col": 3,
              "label": "Kann der Lieferant mit dem MO-2-Aufwand finanziell belastet werden?"
            },
            {
              "subfield": "date",
              "sheet": "Lieferantenauswahl_V4",
              "row": 43,
              "col": 4,
              "label": "QAF übergeben am (Datum)"
            },
            {
              "subfield": "volume",
              "sheet": "Checkliste Vorklärung",
              "row": 33,
              "col": 3,
              "label": "Gefordertes gesamtes Investvolumen ?"
            }
          ]
        }
      }
    },
    {
      "file": "BMW_Multi-QAF_Kaufteile_Analyse_1.xlsx",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "00_Kernbefund",
        "01_Bosch_Familien",
        "02_Thyssen_Familien",
        "03_Bosch_CNY_Korrektur",
        "04_Bosch_Zeilenmatch",
        "05_Thyssen_Zeilenmatch"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": []
        },
        "B_master_rates": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "evidence": []
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "00_Kernbefund",
          "foundSubfields": [
            "material_list",
            "currency"
          ],
          "missingSubfields": [
            "unit_cost"
          ],
          "evidence": [
            {
              "subfield": "material_list",
              "sheet": "00_Kernbefund",
              "row": 1,
              "col": 1,
              "label": "Kaufteil-Analyse — Material/BOM je Lieferant"
            },
            {
              "subfield": "currency",
              "sheet": "00_Kernbefund",
              "row": 2,
              "col": 1,
              "label": "Zeilenweise Kaufteile, Familienvergleich, währungsnormalisiert (EUR). Ergänzt die QAF-Cross-Project-Analyse."
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "process_step_name",
            "manufacturing_cost",
            "step_columns"
          ],
          "evidence": []
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "TEILWEISE",
          "ratio": 0.4,
          "dominantSheet": "00_Kernbefund",
          "foundSubfields": [
            "supplier",
            "currency"
          ],
          "missingSubfields": [
            "part_number",
            "date",
            "volume"
          ],
          "evidence": [
            {
              "subfield": "supplier",
              "sheet": "00_Kernbefund",
              "row": 1,
              "col": 1,
              "label": "Kaufteil-Analyse — Material/BOM je Lieferant"
            },
            {
              "subfield": "currency",
              "sheet": "00_Kernbefund",
              "row": 2,
              "col": 1,
              "label": "Zeilenweise Kaufteile, Familienvergleich, währungsnormalisiert (EUR). Ergänzt die QAF-Cross-Project-Analyse."
            }
          ]
        }
      }
    },
    {
      "file": "LIST_250307_HLackm, MA-42_FAAR-WE_high-low_Preismatrix_Einpreisung-Jan25_KPI-Feb25.xlsx",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Preism unsortiert",
        "Preismatrix sortiert",
        "OEE - Scrap - HK-Plus",
        "Preishistorie",
        "HK-Einpr-Kosten_EAW FWh -838",
        "HK-Einpr-Kosten_EAW FWl -129",
        "EPD",
        "EPD 27.06.",
        "EPD 28.06."
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "OEE - Scrap - HK-Plus",
          "foundSubfields": [
            "cycle_time"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "OEE - Scrap - HK-Plus",
              "row": 2,
              "col": 5,
              "label": "Zykluszeit \ndefiniert [sec]"
            }
          ]
        },
        "B_master_rates": {
          "status": "TEILWEISE",
          "ratio": 0.25,
          "dominantSheet": "Preism unsortiert",
          "foundSubfields": [
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct"
          ],
          "evidence": [
            {
              "subfield": "scrap_pct",
              "sheet": "Preism unsortiert",
              "row": 4,
              "col": 11,
              "label": "Steel - Scrap"
            }
          ]
        },
        "C_material": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "unit_cost",
            "material_list",
            "currency"
          ],
          "evidence": []
        },
        "D_manufacturing_rows": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "process_step_name",
            "manufacturing_cost",
            "step_columns"
          ],
          "evidence": []
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "OEE - Scrap - HK-Plus",
          "foundSubfields": [
            "volume"
          ],
          "missingSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency"
          ],
          "evidence": [
            {
              "subfield": "volume",
              "sheet": "OEE - Scrap - HK-Plus",
              "row": 2,
              "col": 6,
              "label": "IO Stückzahl \npro Schicht"
            }
          ]
        }
      }
    },
    {
      "file": "PL_260401_Thyssen-CLAR-Trebtau.xlsx",
      "family": "UNMATCHED_STANDARD",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Headwinds",
        "Historie",
        "Q2-26",
        "Q1-26",
        "Q4-25",
        "Q3-25",
        "Q2-25",
        "Q1-25R",
        "Q4-24",
        "VERGABE",
        "Rep. Sätze",
        "Umlagen",
        "HK Change",
        "ST05",
        "LTA-Vereinbarungen"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "cycle_time",
            "parts_per_cycle",
            "headcount",
            "machine_rate",
            "inefficiency"
          ],
          "evidence": []
        },
        "B_master_rates": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "labour_rate",
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "evidence": []
        },
        "C_material": {
          "status": "TEILWEISE",
          "ratio": 0.33,
          "dominantSheet": "Q2-25",
          "foundSubfields": [
            "currency"
          ],
          "missingSubfields": [
            "unit_cost",
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "currency",
              "sheet": "Q2-25",
              "row": 2,
              "col": 34,
              "label": "Multiwährung"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "process_step_name",
            "manufacturing_cost",
            "step_columns"
          ],
          "evidence": []
        },
        "E_totals": {
          "status": "FEHLT",
          "ratio": 0,
          "dominantSheet": null,
          "foundSubfields": [],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "profit_total",
            "unit_price"
          ],
          "evidence": []
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 0.8,
          "dominantSheet": "Umlagen",
          "foundSubfields": [
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [
            "part_number"
          ],
          "evidence": [
            {
              "subfield": "supplier",
              "sheet": "Umlagen",
              "row": 6,
              "col": 3,
              "label": "Investumlage: Modifizierung Motormontagelinie bei Lieferant"
            },
            {
              "subfield": "date",
              "sheet": "Historie",
              "row": 1,
              "col": 1,
              "label": "Datum"
            },
            {
              "subfield": "currency",
              "sheet": "Q2-25",
              "row": 2,
              "col": 34,
              "label": "Multiwährung"
            },
            {
              "subfield": "volume",
              "sheet": "Headwinds",
              "row": 6,
              "col": 5,
              "label": "Volumen B-Programm 2024"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_Gen5.1_Pack1_update_2023-03-23 - labour&energy-adder_230816.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "LME-WeightLTA&VOSS-Table",
        "Material_18",
        "Material_40",
        "Material_22",
        "Material_50",
        "Fertigungskosten_18",
        "Fertigungskosten_40",
        "Fertigungskosten_22",
        "Fertigungskosten_50",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Temp",
        "SEKOF_amort"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten_18",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten_18",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten_18",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Fertigungskosten_18",
              "row": 11,
              "col": 13,
              "label": "Maschinenstundensatz\n MSS [BW/h]"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_18",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten_18",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_18",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Fertigungskosten_18",
              "row": 11,
              "col": 22,
              "label": "Ausschuss pro\n Prozessschritt [%]"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material_18",
              "row": 8,
              "col": 4,
              "label": "Invalid Date"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    },
    {
      "file": "QAF_Gen5.1_Pack1_update_repricing_240201_DRAFT-Working-File.xlsx",
      "family": "QAF_LEGACY_DE_SUMMARY",
      "ok": true,
      "error": null,
      "sheetNames": [
        "Zusammenfassung",
        "Machine hourly rate",
        "Labour rate dev",
        "LME-WeightLTA&VOSS-Table",
        "Material_18",
        "Material_40",
        "Material_22",
        "Material_50",
        "Fertigungskosten_18",
        "Fertigungskosten_40",
        "Fertigungskosten_22",
        "Fertigungskosten_50",
        "SBM-SEKOF-FWZ",
        "Rohstoffrisiken",
        "Prämissenblatt",
        "Prämissenblatt_Rohstoff",
        "Protokoll",
        "Temp",
        "SEKOF_amort"
      ],
      "fieldGroups": {
        "A_process_params": {
          "status": "VORHANDEN",
          "ratio": 0.6,
          "dominantSheet": "Fertigungskosten_18",
          "foundSubfields": [
            "cycle_time",
            "headcount",
            "machine_rate"
          ],
          "missingSubfields": [
            "parts_per_cycle",
            "inefficiency"
          ],
          "evidence": [
            {
              "subfield": "cycle_time",
              "sheet": "Fertigungskosten_18",
              "row": 11,
              "col": 8,
              "label": "Zykluszeit [s]"
            },
            {
              "subfield": "headcount",
              "sheet": "Fertigungskosten_18",
              "row": 11,
              "col": 10,
              "label": "Anzahl direkte Mitarbeiter"
            },
            {
              "subfield": "machine_rate",
              "sheet": "Machine hourly rate",
              "row": 4,
              "col": 2,
              "label": "MSS Version 8.4_01_01 © BMW AG"
            }
          ]
        },
        "B_master_rates": {
          "status": "VORHANDEN",
          "ratio": 0.75,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "sga_pct",
            "profit_pct",
            "scrap_pct"
          ],
          "missingSubfields": [
            "labour_rate"
          ],
          "evidence": [
            {
              "subfield": "sga_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "profit_pct",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            },
            {
              "subfield": "scrap_pct",
              "sheet": "Zusammenfassung",
              "row": 18,
              "col": 7,
              "label": "Ausschusskosten"
            }
          ]
        },
        "C_material": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Fertigungskosten_18",
          "foundSubfields": [
            "unit_cost",
            "currency"
          ],
          "missingSubfields": [
            "material_list"
          ],
          "evidence": [
            {
              "subfield": "unit_cost",
              "sheet": "Fertigungskosten_18",
              "row": 11,
              "col": 15,
              "label": "Fertigungseinzelkosten\n FEK [BW]"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            }
          ]
        },
        "D_manufacturing_rows": {
          "status": "VORHANDEN",
          "ratio": 0.67,
          "dominantSheet": "Machine hourly rate",
          "foundSubfields": [
            "process_step_name",
            "manufacturing_cost"
          ],
          "missingSubfields": [
            "step_columns"
          ],
          "evidence": [
            {
              "subfield": "process_step_name",
              "sheet": "Machine hourly rate",
              "row": 7,
              "col": 8,
              "label": "Load rate [%]\n based on operational time"
            },
            {
              "subfield": "manufacturing_cost",
              "sheet": "Zusammenfassung",
              "row": 12,
              "col": 7,
              "label": "Fertigungskosten"
            }
          ]
        },
        "E_totals": {
          "status": "TEILWEISE",
          "ratio": 0.2,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "profit_total"
          ],
          "missingSubfields": [
            "material_total",
            "manufacturing_total",
            "sga_total",
            "unit_price"
          ],
          "evidence": [
            {
              "subfield": "profit_total",
              "sheet": "Zusammenfassung",
              "row": 23,
              "col": 12,
              "label": "Vertriebs- & Verwaltungsgemeinkosten, Generic R&D + Gewinn"
            }
          ]
        },
        "F_meta": {
          "status": "VORHANDEN",
          "ratio": 1,
          "dominantSheet": "Zusammenfassung",
          "foundSubfields": [
            "part_number",
            "supplier",
            "date",
            "currency",
            "volume"
          ],
          "missingSubfields": [],
          "evidence": [
            {
              "subfield": "part_number",
              "sheet": "Zusammenfassung",
              "row": 8,
              "col": 6,
              "label": "BMW Sachnummer:"
            },
            {
              "subfield": "supplier",
              "sheet": "Zusammenfassung",
              "row": 5,
              "col": 2,
              "label": "Bearbeiter Lieferant:"
            },
            {
              "subfield": "date",
              "sheet": "Material_18",
              "row": 8,
              "col": 4,
              "label": "Invalid Date"
            },
            {
              "subfield": "currency",
              "sheet": "Zusammenfassung",
              "row": 10,
              "col": 13,
              "label": "Währungen"
            },
            {
              "subfield": "volume",
              "sheet": "Zusammenfassung",
              "row": 14,
              "col": 2,
              "label": "Gesamtvolumen gem. Anfrage [Teile]:"
            }
          ]
        }
      }
    }
  ]
}